Installation at Fruitspot Cape Town

Installation at

Fruitspot Cape Town

  Installation at Fruitspot Cape Town October 2018
  4 days to level site for machines and tanks
  Will produce an average of 5000 litres high quality drinking water per day
  50 000 litres storage capacity
  Water will be pumped into existing storage tanks which are connected to buildings main supply
  Took 2 days to get machines into place
  Very little space on the side of the building, had to push machines one by one and rigged them into position