Installation at Cape Nature Riverlands

Installation at

Cape Nature Riverland

Installation for Cape Nature Riverlands September 2018
Two days for cilvils and installation
Slabs and stones were put either side of the machine to reduce the amount of sand blown
Produces an average of 1000 Litres high quality drinking water per day
 Plumbed into the main house water supply
  Storage capacity of 5000 litres